The project is located in the old district of the First Affiliated Hospital of Zhengzhou City, Zhengzhou City. The pile diameter is 600mm and the depth is about 43 meters. The geological conditions are silty clay mixed with two layers of calcareous cementation. The drilling time of a single pile is about 60 minutes. As the construction site has just started, the specific fuel consumption and other parameters need to be counted.